A flexible pavement is constructed with 5 inches of sand-mix asphaltic wearing surface, 9 inches of dense-graded crushed stone base, and 10 inches of crushed stone subbase. The base has a drainage coefficient of 0.90 while the subbase drainage coefficient is 1.0. Determine the structural number of the pavement.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
A flexible pavement is constructed with 5 inches of sand-mix asphaltic wearing surface, 9 inches of...
Questions
question
Mathematics, 19.11.2020 16:40
question
Computers and Technology, 19.11.2020 16:40
question
Spanish, 19.11.2020 16:40
question
Biology, 19.11.2020 16:40
question
Mathematics, 19.11.2020 16:40
question
Mathematics, 19.11.2020 16:40
question
English, 19.11.2020 16:40
question
Mathematics, 19.11.2020 16:40
question
Mathematics, 19.11.2020 16:40