subject
Engineering, 09.12.2021 19:30 barisegebalci2352

Which practice in the 5S philosophy will help reduce waste related to waiting because of equipment downtime? ОА. shine
OB sorting
Oc. set in place
OD. standardize

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
Which practice in the 5S philosophy will help reduce waste related to waiting because of equipment d...
Questions
question
Mathematics, 22.02.2021 06:20
question
Chemistry, 22.02.2021 06:20