The required production rate for a certain product is 45 units/hr. Its work content time is 71.5 min. The production line for this product includes 5 automated workstations. Because the automated stations are not entirely reliable, the overall line efficiency is expected to be only 88%. All of the other stations will have one worker each. It is anticipated that 6% of each cycle will be lost due to worker repositioning. Balance delay is expected to be 7%.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
The required production rate for a certain product is 45 units/hr. Its work content time is 71.5 min...
Questions
question
Mathematics, 08.06.2020 05:57
question
Mathematics, 08.06.2020 05:57
question
Mathematics, 08.06.2020 05:57
question
Mathematics, 08.06.2020 05:57