subject
Engineering, 25.11.2021 15:40 sleepyflower10

In the air, the amount of work done is equal to 4' If the lifting cable of a hoist lifts a 250-lb engine
times 250 lb, or 1,000 foot-pounds of work.
Select one:
O A.5
O B. 2
O C.3
O D.4

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
You know the right answer?
In the air, the amount of work done is equal to 4' If the lifting cable of a hoist lifts a 250-lb...
Questions
question
Mathematics, 18.03.2021 23:20
question
Mathematics, 18.03.2021 23:20
question
Computers and Technology, 18.03.2021 23:20
question
Mathematics, 18.03.2021 23:30
question
Geography, 18.03.2021 23:30