subject
Engineering, 17.10.2021 06:30 Queiao4088

2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge D.


2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
You know the right answer?
2. Rain gauge D was out of operation for a month. Estimate the amount of rainfall (mm) for a gauge D...
Questions
question
Computers and Technology, 11.09.2021 01:00
question
Chemistry, 11.09.2021 01:00
question
Mathematics, 11.09.2021 01:00