subject
Engineering, 06.10.2021 21:30 sydneydavis57

) A solid round bar with diameter of 2-in has a groove cut to a diameter of 1.8-in, with a groove radius of 0.1-in. The bar is NOT rotating. The bar is loaded with a repeated bending load that causes the bending moment at the groove to fluctuate between 0 and 25000 lbf-in. The bar is hot-rolled AISI 1095, but the groove has been machined. Determine the factor of safety for fatigue based on infinite life (use the ASME elliptical criteria) and the factor of safety for yielding. ** Note: For a non-rotating, circular cross-section, an effective diameter is used to determine the size based Marin factor. Please refer to equations 6-22 through 6-25 in your book

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
) A solid round bar with diameter of 2-in has a groove cut to a diameter of 1.8-in, with a groove ra...
Questions
question
Biology, 05.07.2019 08:30