subject
Engineering, 10.08.2021 02:20 vrivers60

Aassembly line in a car assembly plant is scheduled to be available for 10.5 hours of production each day. The actual operating time each day has been found to be on average 8 hours after taking into consideration unplanned downtime incidents. Each day an average of 500 cars is produced by the assembly line, but due to the process capability of the equipment (on the assembly line) an average of 100 cars are found to be defective each day. The assembly line was designed to produce at a rate of 75 cars per hour when operational. Determine the following:
a. Availability Performance
b. Quality Overall Equipment
c. Effectiveness

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
You know the right answer?
Aassembly line in a car assembly plant is scheduled to be available for 10.5 hours of production eac...
Questions
question
Mathematics, 28.05.2020 03:00