subject
Engineering, 07.07.2021 02:30 lxlie2315

Technician A says that the purpose of the Pre-Delivery Service is to inspect and identify any problems prior to the vehicle's delivery to the customer and to verify that the vehicle is
functionally and visually ready for delivery to the customer.
Technician B says that the Pre-Delivery Service is performed based upon the standards
published in a Pre-Delivery Service Bulletin specific to each vehicle model and model year.
Who is right?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
Technician A says that the purpose of the Pre-Delivery Service is to inspect and identify any probl...
Questions
question
Mathematics, 18.02.2021 01:10
question
Mathematics, 18.02.2021 01:10
question
Social Studies, 18.02.2021 01:20
question
Mathematics, 18.02.2021 01:20