subject
Engineering, 16.06.2021 21:00 smiley29162

Match the goal to the program or publication. 1. to improve the energy efficiency of all commercial and industrial buildings by 20% by the year 2020

2. to reduce water use of appliances by 20%

3. to devise a set of guidelines for choosing green building materials

WaterSense program
Federal Green Construction Guide for Specifiers
Better Buildings Initiative

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
You know the right answer?
Match the goal to the program or publication. 1. to improve the energy efficiency of all commercial...
Questions
question
Chemistry, 02.01.2020 15:31
question
Mathematics, 02.01.2020 15:31
question
Physics, 02.01.2020 15:31