Problem 1. Network-Flow Programming (25pt) A given merchandise must be transported at a minimum total cost between two origins (supply) and two destinations (demand). Destination 1 and 2 demand 500 and 700 units of merchandise, respectively. At the origins, the available amounts of merchandise are 600 and 800 units. USPS charges $5 per unit from origin 1 to demand 1, and $7 per unit from origin 1 to demand 2. From origin 2 to demand 1 and 2, USPS charges the same unit cost, $10 per unit, however, after 200 units, the unit cost of transportation increases by 50% (only from origin 2 to demand 1 and 2). a) Formulate this as a network-flow problem in terms of objective function and constraint(s) and solve using Excel Solver.
b) How many units of merchandise should be shipped on each route and what is total cost?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
Problem 1. Network-Flow Programming (25pt) A given merchandise must be transported at a minimum tota...
Questions
question
Mathematics, 09.04.2020 07:14
question
Mathematics, 09.04.2020 07:14