subject
Engineering, 18.05.2021 20:20 chaseashley24

PLEASE HELP ME Diversitopia is a mid-sized city. It has recently bought a piece of land from a private owner. The previous land owner farmed the land, but the land has now been abandoned for over a decade. The farmland is approximately 500 hectares, or 2 square miles, and sits on top of a hill that overlooks a river.
The office of city planning and the mayor are accepting proposals for how the land should be used. They are interested in sustainable planning and consider themselves a “green” city.
They would like a project that encourages a diverse community of organisms, protects nutrient cycling, and maintains soil stability. Although the government is very interested in the scientific benefits of the project, it is not their only focus. They must also consider the cost to the city and the value it will provide to the citizens.

1. A way to cover the soil so it cannot wash or blow away?
2. A way to bind the soil below the ground?
3. A way that the soil will be enriched with additional nutrients?
4. A way for stopping eroded soil from washing into the river?
5. A way for stopping eroded soil from washing into the river?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 06.07.2019 03:10
Two slings are used to lift a girder of length l and uniform weight per unit length. what is the best position for the slings if the bending moment due to the weight of the girder is to be kept to a minimum?
Answers: 2
question
Engineering, 06.07.2019 03:10
Explain the strain-hardening phenomenon on the basis of dislocation - dislocation strain field interactions. also, briefly describe what generally happens to the ductility of a metal that has been strain hardened (i.e. does strain hardening make a metal more ductile or
Answers: 3
You know the right answer?
PLEASE HELP ME Diversitopia is a mid-sized city. It has recently bought a piece of land from a priv...
Questions
question
Mathematics, 27.05.2021 19:50
question
Mathematics, 27.05.2021 19:50
question
Engineering, 27.05.2021 19:50