subject
Engineering, 13.05.2021 18:20 24lcallis

Disk Scheduling (45 Points). Assume that you are trying to schedule track requests for the arm on a disk with 150 tracks. Currently the following set of disk requests exists in a queue (order that requests were received): 66, 138, 93, 77, 79, 24, 5. The disk arm can move at the rate of 1 track per time unit. As these requests are being processed, four more requests come in at the following times: 111 at t=20, 14 at t=50, 102 at t=75, and 22 at t=100. Using the simulation format and scheduling policies we covered in class, complete the following the problems: Assuming that the disk arm is currently positioned over track 49, use the Shortest Seek Time First (SSFT) Scheduler to indicate the order in which the track requests are processed, and the total amount of time that it takes to process the entire set.
Assuming that the disk arm is currently positioned over track 49 and is traveling in the direction of increasing track numbers, use the Circular Scan (C-SCAN) Scheduler to indicate the order in which the track requests are processed, and the total amount of time that it takes to process the entire set. Assume that the quick return from the end of the disk to the beginning takes 5 time units.
Assuming that the disk arm is currently positioned over track 49 and is traveling in the direction of increasing track numbers, use the LOOK Scheduler to indicate the order in which the track requests are processed, and the total amount of time that it takes to process the entire set.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
You know the right answer?
Disk Scheduling (45 Points). Assume that you are trying to schedule track requests for the arm on a...
Questions
question
Mathematics, 07.05.2021 05:30
question
Social Studies, 07.05.2021 05:30
question
Mathematics, 07.05.2021 05:30
question
Chemistry, 07.05.2021 05:30