Engineering, 23.04.2021 15:40 haileysolis5

An arrival rate of 720 veh/h arrive at a single lane signalized approach that is controlled by a traffic signal that operates at a cycle length of 60 seconds and a 50:50 green split. The amber and all-red interval is 5 seconds. The unopposed saturation flow rate was measured to be 1800 veh/h/lane with a start-loss 2 seconds and end gain of 3 seconds, respectively. For the approach do the following for a single cycle length: a. Compute the maximum queue size formed upstream the traffic signal.
b. Compute the time required to dissipate the queue.
c. Compute the average vehicle delay experienced by vehicles traveling on the approach using the macroscopic procedures that were described in the class.
d. Compute the average vehicle delay experienced by vehicles traveling on the approach by tracking the arrival and departure times of each vehicle. Assume the first vehicle arrives at the midheadway after the red interval starts.
e. Repeat part (d) considering the first vehicle arrival ranges from 0 to 5 seconds. Comment on the sensitivity of delay estimates to the arrival time of the first vehicle.
f. Compute the number of vehicles that come to a complete stop during the cycle length.
g. Compute the maximum delay experienced by a vehicle.
h. What is the delay experienced by the third vehicle in queue assuming that the first vehicle arrives at the start of the red.
The Cycle length is 60 seconds. The problem should be solved fo a single cycle length.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
An arrival rate of 720 veh/h arrive at a single lane signalized approach that is controlled by a tra...
Questions
question
Mathematics, 26.07.2020 01:01
question
Social Studies, 26.07.2020 01:01
question
Mathematics, 26.07.2020 01:01
question
Mathematics, 26.07.2020 01:01
question
Spanish, 26.07.2020 01:01