subject
Engineering, 21.04.2021 17:30 vanna7353

Project: Reverse Engineering Documentation and Presentation Assignment Directions

Engineers usually work in teams with members who do not have the same level of technical knowledge. They rely on visual and graphic aids to explain and support their communication efforts. To practice these skills, write a 3- to 5-page paper that describes your suggestions for a reverse engineering project. You do not need to complete the reverse engineering project. You are presenting instead an evaluation of a product that you believe could be improved. This may include an object or product that you have reverse engineered in the past or a product that you would someday like to analyze.

Include two of the following visual and graphic aids:

Product Teardown Chart (if completed)
Function Structure Diagram
Exploded View Diagram
Morphological Matrix
Design Decision Matrix

The visual aids are not just supplemental to your presentation. They must be incorporated into your reasoning as you make design modification suggestions.

Assignment Guidelines:

a written analysis or a script for an oral presentation

two visual or graphic aids that support the presentation

Submission Requirements:

3 to 5 pages double spaced

Proper grammar and vocabulary is required.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Air flows over a heated plate àt a velocity of 50m/s. the local skin factor coefficient at a point on a plate is 0.004. estimate the local heat transfer coefficient at this point.the following property data for air are given: density = 0.88kg/m3 , viscosity 2.286 x 10 ^-5 kgm/s , k = 0.035w/mk ,cp = 1.001kj/kgk. use colburn reynolds analogy.
Answers: 1
You know the right answer?
Project: Reverse Engineering Documentation and Presentation Assignment Directions

Engi...
Questions