subject
Engineering, 19.04.2021 16:00 xojade

3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. The peak demand is 0.578 m3 /s. Determine the required diameter of ductile-iron pipe such that the flow velocity during peak demand is 2.5 m/s. Round the pipe diameter upward to the nearest 25 mm (i. e., 25 mm, 50 mm, 75 mm, . . .). The water pressure at the development is to be at least 140 kPa during peak demand. If the water at the treatment plant is stored in a ground-level reservoir where the level of the water is 10.00 m NGVD and the ground elevation at the suburban development is 8.80 m NGVD, determine the pump head that must be available to meet peak demands. (*NGVD

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 06.07.2019 02:30
Around steel bar, made from material with a yield stress of 750mpa, is loaded so that it has stresses co locations of maximum normal stress and maximum shear stress. use maximum shear stress and maximum distortion energy theories to calculate the safety factors for initial yielding failures.
Answers: 3
You know the right answer?
3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. T...
Questions