If a 2:1 transformer has a 220 VAC input, a voltage test at the primary winding should produce a meter reading of A. 220 VAC.
B. 110 VAC
C. 440 VAC
D. 0 VAC.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
If a 2:1 transformer has a 220 VAC input, a voltage test at the primary winding should produce a met...
Questions
question
Mathematics, 30.12.2019 23:31
question
Mathematics, 30.12.2019 23:31