subject
Engineering, 08.04.2021 20:40 isaiahjohnson2594

Select three costs that should be included in a project budget. facility costs

technology costs

educational costs

audit costs

staffing costs

conference costs

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
question
Engineering, 06.07.2019 02:30
Precipitation hardening can be achieved in many light alloys by a three-step heat treatment. what is carried out and what is the purpose at each step? why is such a treatment necessary based on the nucleation and growth theory of phase transformation. compare this treatment with tempering martensite for carbon steels (similarities and differences).
Answers: 1
You know the right answer?
Select three costs that should be included in a project budget. facility costs

technolo...
Questions
question
Biology, 25.01.2022 02:50
question
Mathematics, 25.01.2022 02:50