XYZ orders 5000 custom made parts from ABC for one of its products. When the order is originally made ABC indicates it will charge $75 per part. This cost is based in part on the cost of materials. After the agreement is completed, but before production of the part begins, ABC engineer Christine Carsten determines that a much less expensive alloy would cut ABC's costs by $18 a part. Christine brings this to the attention of ABC's Vernon Waller, who authorized the sales agreement with XYZ Vernon asks, "How would anyone know the difference?" Christine replies, "Probably no one would unless they were looking for a difference and did a fair amount of testing. In most cases the performance will be virtually the same.. although some parts might not last quite as long." Vernon says, "Great, Christine, you've just made a bundle for ABC" Puzzled, Christine replies. "But shouldn't you tell XYZ about the change?" "Why?" Vernon asks, "The basic idea is to satisfy the customer with good quality parts, and you've just said we will, So what's the problem?" The problem, Christine thinks to herself, is that the customer isn't getting what was promised. Further, even if XYZ would be satisfied with the different part, shouldn't you tell XYZ about the change?" 'why?' Vernon asks, "The basic idea is to satisfy the customer with good quality parts, and you've just said we will. So what's the Problem?" The problem, Christine thinks to herself is that the customer isn't getting what was promised. Further, even if XYZ would be satisfied with the different part, shouldn't it be given the opportunity to decide if it finds the change acceptable - and to benefits from lowered cost? Should Christine share her further diagnosis with Vernon, or should she simply drop the matter? Christine shares her further thoughts with Vernon. He replies. "I just don't agree, Christine This is business, not engineering XYZ will be a satisfied customer, and we'll be a satisfied supplier, We're not in the business of giving away money, you know." Is there any reason for Christine to press further? Do you agree that Vernon is just doing "good business"? Christine decides there is nothing further for her to do, The less expensive part is produced. As the shipment is prepared to be sent to XYZ, Christine is asked to sign a report verifying that the specification for the part have been met. As she looks over the details she notices that the original composition of the metal is listed rather than the cheaper alloy. Should she sign the report anyway? Christine refuses to sign the report However, Vernon persuades her fellow engineer, John Richards, to sign it. What should Christine do now? Which cannons of the ENOR code of ethics were violated? why?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
Tom is having a problem with his washing machine. he notices that the machine vibrates violently at a frequency of 1500 rpm due to an unknown rotating unbalance. the machine is mounted on 4 springs each having a stiffness of 10 kn/m. tom wishes to add an undamped vibration absorber attached by a spring under the machine the machine working frequency ranges between 800 rpm to 2000 rpm and its total mass while loaded is assumed to be 80 kg a) what should be the mass of the absorber added to the machine so that the natural frequency falls outside the working range? b) after a first trial of an absorber using a mass of 35 kg, the amplitude of the oscillation was found to be 10 cm. what is the value of the rotating unbalance? c) using me-3.5 kg.m, find the optimal absorber (by minimizing its mass). what would be the amplitude of the oscillation of the absorber?
Answers: 3
You know the right answer?
XYZ orders 5000 custom made parts from ABC for one of its products. When the order is originally mad...
Questions
question
Mathematics, 18.01.2020 13:31
question
Mathematics, 18.01.2020 13:31
question
History, 18.01.2020 13:31