subject
Engineering, 18.03.2021 02:00 MarbleMonkey7907

1. Demand for Quality and Efficiency A. Determination to succeed
B. Fondness for updates on information
C. The Quality of being depended upon to finish one's work
D. Insistence for the best results at the shortest possible time
E. The trait of being always on the lookout for opportunities
F. The plotting of a strategy for a goal and evaluating it's progress
G. The ability to convince people about the merits of a product and induce them to tell others about it
H. trust in one's abilities
I. Readiness to venture into new fields
J. Establishing of a clear objective​

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
1. Demand for Quality and Efficiency A. Determination to succeed
B. Fondness for updates on in...
Questions