A three-story structure is to be constructed over an 8000-m2 site. The initial subsurface exploration indicates the presence of sinkholes and voids due to dissolution of the limestone formation. The predominant soil type is a silty fine sand grading to a fine sand with seams of sandy clay. The design indicates that shallow foundations can be used for this project provided the soils were made more homogeneous as far as load support and no voids were present within the depth up to 7.6 m below the ground surface. Assume groundwater is not a concern. Dynamic compaction is proposed to improve the ground. The local contractor doing dynamic compaction has a 15-ton tamper with the diameter of 2.0 m and the height of 1.4 m. You are requested to conduct the preliminary design for this dynamic compaction project including drop height, spacing, number of drops, number of passes, estimated crater depth, and settlement

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
A three-story structure is to be constructed over an 8000-m2 site. The initial subsurface exploratio...
Questions
question
Chemistry, 18.03.2020 22:32
question
Mathematics, 18.03.2020 22:32