Kim is working on the cost estimate and feasible design options for a building. Which stage of a construction plan is Kim working on now? A. design development B. schematic design C. mechanical D. structural

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
Kim is working on the cost estimate and feasible design options for a building. Which stage of a con...
Questions
question
Mathematics, 20.04.2020 16:01
question
Health, 20.04.2020 16:02
question
History, 20.04.2020 16:02
question
Mathematics, 20.04.2020 16:03
question
English, 20.04.2020 16:03
question
History, 20.04.2020 16:03