Engineering, 01.03.2021 20:50 25linm

You are moving 300 CCY per hour of material from the cut to the fill along a haul road that is 6,000 lf long. The dry unit weight of the material is 2,500 lb/CCY with a 12% water content. The elevation of the cut is 500 feet above sea level. The project manager anticipates the completion of the embankment, which is at an elevation of 900 feet, can be completed in 65 hours using a spread of 4 scrapers, 2 dozers, 1 compactor, and a water truck. What is the grade resistance as a percent when hauling from the cut to the fill

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
You are moving 300 CCY per hour of material from the cut to the fill along a haul road that is 6,000...
Questions
question
Mathematics, 27.12.2019 18:31
question
Mathematics, 27.12.2019 18:31
question
History, 27.12.2019 18:31