subject
Engineering, 23.02.2021 01:30 dinosaur10

Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft above the existing road) is to be constructed on an existing level highway. The existing highway has a design speed of 50 mi/h. The overpass structure is to be level, centered above the railroad, and 180 ft long. What length of the existing level highway must be reconstructed to provide an appropriate vertical alignment

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
You know the right answer?
Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft ab...
Questions
question
English, 20.04.2021 04:10
question
Chemistry, 20.04.2021 04:10
question
Mathematics, 20.04.2021 04:10
question
Mathematics, 20.04.2021 04:10
question
History, 20.04.2021 04:10
question
Social Studies, 20.04.2021 04:10
question
Mathematics, 20.04.2021 04:10
question
Mathematics, 20.04.2021 04:10