Engineering, 18.02.2021 21:00 nerd58

Two sites are being considered for wind power generation. On the first site, the wind blows steadily at 7 m/s for 3000 hours per year. On the second site, the wind blows steadily at 10 m/s for 2000 hours per year. The density of air on the both sites is 1.25 kg/m3 . Assuming the wind power generation is negligible during other times. Calculate the maximum power of wind on each site per unit area, in kW/m2 .

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the major difference between thermoplastics and thermosetting plastics from the polymerization structure point of view?
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
Two sites are being considered for wind power generation. On the first site, the wind blows steadily...
Questions
question
Mathematics, 18.03.2021 03:30