subject
Engineering, 16.02.2021 17:30 natalie2sheffield

A company makes two kinds of leather belts A & B, Belt A is of high quality and belt B is of low quality. The respective profit are

Rs. 4 and Rs. 3 per belt. The production of each of type A belt

requires twice as much time as of belt of type B, and if all belts were

of B type, the company would make 1000 belts per day. The supply

of leather is sufficient for only 800 belts per day (for A & B type

combined). Belt A requires a fancy buckle and only 400 of these are

available per day. There are 700 buckles a day available for belt B.

What should be the daily production of each type of belt? Formulate

this problem as an LP model and solve it using the simplex method.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
A company makes two kinds of leather belts A & B, Belt A is of high quality and belt B is of lo...
Questions
question
Mathematics, 28.01.2021 17:10
question
Mathematics, 28.01.2021 17:10
question
Mathematics, 28.01.2021 17:10
question
Mathematics, 28.01.2021 17:10
question
History, 28.01.2021 17:10
question
Mathematics, 28.01.2021 17:10
question
Mathematics, 28.01.2021 17:10