When preparing to begin a earth moving project that will require at least 2 years of site preparations and million tons of material has to be relocated and some blasting from solid rock
will be a part of the process. I have given you several steps that are required before and during
the process. Put them in order and give a short description of what work and preparation will
need to be completed in each step.
1. You will need to acquired the property and mineral rights or have a contract to perform
all said work described in the contract. Write down some considerations that are a must
happen before entering the property with a piece of equipment.
Call the wife and make plans for supper.
Call 811
Call the power company
Call an engineering firm.
Get in touch with the local fire department.
Get in touch with the highway department.
Get in touch with the county road department.
Check the weight limits on any bridges that have to be crossed with equipment our
trucks hauling materials.
Get in touch with the local hardware and set up an account.
Find an equipment dealership to purchase parts when needed to repair equipment.
Get in touch with the local unemployment office to set up a hiring event.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:20
In the winter, in order to keep the classroom steadily at 68 f before 10 pm, heating with an average rate of 42,000 btu/hr is provided. assume the outdoor temperature maintains at 32°f, determine the electrical power (kw) required to (a) operate a reversible heat pump (b) operate a real heat pump with a cop (7) of 4.5 and (c) operate an electrical-resistance heater.
Answers: 3
question
Engineering, 04.07.2019 19:20
Acircular pipe of 30mm outside diameter is placed in an airstream at 30 c and latm pressure. the air moves in cross flow over the pipe at 20 m/s, while the outer surface of the pipe is maintained at 110 c. what is the drag force exerted on the pipe per unit length? what is the rate of heat transfer from the pipe per unit length?