subject
Engineering, 18.01.2021 14:00 dani19cano

A soil sample is taken from a borrow pit in Bellingham, Washington and has a natural void ratio of 1.27. The soil will be used for a highway project wherein a total of 150,000 m^3 of soil is needed in its compacted state. Its compacted void ratio will be 0.49. How much volume must be excavated from the borrow pit to meet the project requirements?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:20
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i.e., a violation of one statement leads to the violatio the other statement)
Answers: 2
You know the right answer?
A soil sample is taken from a borrow pit in Bellingham, Washington and has a natural void ratio of 1...
Questions
question
Mathematics, 29.06.2020 22:01
question
Social Studies, 29.06.2020 22:01