subject
Engineering, 11.01.2021 14:00 itscheesycheedar

Ten customers visit Candy Haven Bakery from 8am to 10 am. The customers spend 10, 15, 20, 11, 8, 12, 5, 18, 29, and 32 minutes in the bakery. What is the average flow rate of customers in this bakery per hour?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
Ten customers visit Candy Haven Bakery from 8am to 10 am. The customers spend 10, 15, 20, 11, 8, 12,...
Questions
question
English, 24.09.2019 03:00
question
Chemistry, 24.09.2019 03:00
question
Mathematics, 24.09.2019 03:00