subject
Engineering, 11.01.2021 01:00 goldenrizo

Your boss has been tracking cost of construction. He created cost index to track these costs. Costs during the first year of the index were $8 per square foot of space and the index value was set for 00 for that first year. Past year survey costs were $120 per square foot. What index number will your boss publish in his report for this year? If we are then told that the index value was 925 last year, what was the cost per square foot last year?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:20
In the winter, in order to keep the classroom steadily at 68 f before 10 pm, heating with an average rate of 42,000 btu/hr is provided. assume the outdoor temperature maintains at 32°f, determine the electrical power (kw) required to (a) operate a reversible heat pump (b) operate a real heat pump with a cop (7) of 4.5 and (c) operate an electrical-resistance heater.
Answers: 3
question
Engineering, 06.07.2019 03:10
Steel balls 12 mm in diameter are annealed by heating to 1150 k and then slowly cooled to 400 k in an air att 325 k and h -20 w/m2 k. assume the properties of the steel to be k- 40 w/m k,p 7800 kg/m3, and cp 600 j/kg k. a. determine whether lumped system method can be used to analyze this problem and if so why" b. determine the time required for the cooling process. c. determine the total amount of heat lost from each ball to the ambient air
Answers: 1
You know the right answer?
Your boss has been tracking cost of construction. He created cost index to track these costs. Costs...
Questions
question
Mathematics, 30.04.2021 17:50
question
Mathematics, 30.04.2021 17:50
question
Mathematics, 30.04.2021 17:50
question
Mathematics, 30.04.2021 17:50