subject
Engineering, 31.12.2020 07:40 raiapowell

Multiple Choice Which option identifies why a geological engineer would be valuable to the project in the following scenario?
An architectural firm in Dubai has been hired to build a skyscraper that will be taller than any other building in the city. The firm is currently
consulting with a geological engineer.
Geological engineers can ensure that the stress of a building is sound.
Geological engineers can design equipment to properly evaluate the site.
Geological engineers can ensure that the materials chosen are the most cost-effective and environmentally sound
Geological engineers can help determine if the soil and structural stability in the building's location are satisfactory

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
You know the right answer?
Multiple Choice Which option identifies why a geological engineer would be valuable to the project...
Questions
question
Chemistry, 03.03.2020 02:56