As a materials engineer in charge of designing concrete mix and facing the following problems, which admixture would you use in each case during mixing or at the
jobsite?
a. There is a large quantity of freshly mixed concrete and the work at the job-site
had to stop because of rain.
b. More time is expected to be needed for finishing concrete.
c. The structure is subjected to freezing
d. Concrete is to be around tightly spaced reinforcing steel.
e. Concrete mix will be hauled a long distance.
f. High early strength concrete is required, but not necessarily high ultimate
strength.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
question
Engineering, 04.07.2019 19:20
Apreheater involves the use of condensing steam at 100°c on the inside of a bank of tubes to heat air that enters at 1 atm and 25°c. the air moves at 5 m/s in cross flow over the tubes. each tube is 1 m long and has an outside diameter of 10 mm. what is the minimum value of nl needed to achieve an outlet temperature of t 75 c? what is the corresponding pressure drop across the tube bank?
Answers: 3
question
Engineering, 06.07.2019 03:20
What is the maximum height from which a mass of 30 kg can fall on to a flange on the lower end of a vertical rod of length 1.0 m and diameter 20 mm, the upper end being rigidly fixed, if the stress in the rod is not to exceed 80 mpa? the tensile modulus of the rod is 200 gpa.
Answers: 3
You know the right answer?
As a materials engineer in charge of designing concrete mix and facing the following problems, whic...
Questions
question
Mathematics, 17.05.2021 22:50
question
Mathematics, 17.05.2021 22:50
question
Mathematics, 17.05.2021 22:50
question
Mathematics, 17.05.2021 22:50
question
Mathematics, 17.05.2021 22:50
question
Mathematics, 17.05.2021 22:50
question
World Languages, 17.05.2021 22:50