subject
Engineering, 26.12.2020 17:50 bear7823

1- (50 points) Consider the following soil profile. If a fill with unit weight of 120 lbf/ft3 and height of 10 ft is planned to be placed on the field, estimate: a) The primary consolidation settlement if the preconsolidation stress is 1100 psf. b) The degree of consolidation and the corresponding settlement six months after loading. c) The time (in minutes) that it takes for a 1-in-thick lab specimen of this soil to get to the same degree of consolidation as the field. d) The secondary and total consolidation 6 years after placement of the fill if the time to complete primary consolidation is 1.6 years.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 06.07.2019 03:10
List and describe the parts of boxford cnc milling machine with pictures?
Answers: 2
You know the right answer?
1- (50 points) Consider the following soil profile. If a fill with unit weight of 120 lbf/ft3 and he...
Questions
question
Mathematics, 24.03.2021 03:40
question
Mathematics, 24.03.2021 03:40
question
Mathematics, 24.03.2021 03:40
question
Medicine, 24.03.2021 03:40
question
Spanish, 24.03.2021 03:40