subject
Engineering, 26.12.2020 04:00 jamarengle2

A four-legged, pre-timed signalized intersection has four approaches: northbound (NB), southbound (SB), eastbound (EB), and westbound (WB). The intersection has an 80-second signal cycle. Each approach has a constant saturation flow rate of 2400 veh/h. The NB, SB, EB, and WB approaches have effective green times (in seconds) of 25, 22, 23, and 21, respectively. The total flow rates for NB, SB, EB, and WB approaches (in Veh/h) are 480, 470, 505, and 595, respectively. These traffic flows account for the peak 15-min period. At the start of the analysis period, there were no initial queues in the SB, and WB approaches. However, in the NB and EB approaches, there were initial queues at the start of the analysis period, and the average delay per vehicle due to these initial queues in each NB and EB approach was 4 seconds. It is known that the upstream signal does not have any impact on the randomness of the arrival pattern at this intersection. Determine the level of service (LOS) for the NB, and EB approaches.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
A four-legged, pre-timed signalized intersection has four approaches: northbound (NB), southbound (S...
Questions
question
Mathematics, 21.02.2020 01:30