The is responsible for scheduling work throughout the factory.
Select one:
a. first-line sup...
Engineering, 09.12.2020 18:10 donaldpartee1
The is responsible for scheduling work throughout the factory.
Select one:
a. first-line supervisor
b. production planner
c. industrial engineer
d. factory manager
Answers: 3
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
Mathematics, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
History, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
World Languages, 09.11.2020 01:00
Mathematics, 09.11.2020 01:00
English, 09.11.2020 01:00