Engineering, 30.11.2020 19:10 987654321156

In which phase and for what purpose does a construction manager work with various consultants? In the [blank] phase, a construction manager works closely with architects, civil engineers, electrical engineers, and other consultants to prepare a [blank]. Choices for first [blank]
A. design and planning
B. Construction
C. Post construction

Choices for second [blank]
A. draft
B. Sketch
C. Blueprint

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
You know the right answer?
In which phase and for what purpose does a construction manager work with various consultants? In th...
Questions
question
Mathematics, 08.01.2021 04:50
question
Biology, 08.01.2021 04:50
question
Mathematics, 08.01.2021 04:50
question
Mathematics, 08.01.2021 04:50