What is the difference between a negotiated price bidding process and a low-bid bidding process? In a negotiated price process, the price is set and the first contractor to bid for the work gets the job, but in a low-bid process, the
contractor with the lowest bid wins.
O
In a negotiated price process, the contractor that can show the best qualifications wins, but in a low-bid process, the contractor with the
lowest bid in terms of price wins.
In a negotiated price process, the price is flexible, but in a low-bid process, bidding continues until a bidding contractor bids low enough to
reach a set price for the project.
O In a negotiated price process, the projects are large, but in a low-bid process, the projects are small with smaller budgets,

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
You know the right answer?
What is the difference between a negotiated price bidding process and a low-bid bidding process? In...
Questions
question
Mathematics, 24.08.2019 00:00