Calculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390.

b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 19:10
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
question
Engineering, 04.07.2019 19:20
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
You know the right answer?
Calculate the cost per cubic yard to place concrete using each of the alternatives described. The wo...
Questions
question
Mathematics, 09.04.2020 21:35
question
Mathematics, 09.04.2020 21:35
question
Mathematics, 09.04.2020 21:35