subject
Engineering, 12.11.2020 19:10 lylesparks2791

A private foundation wants to estimate the construction cost of building a library in Miami, Florida in the year 2008. A similar project that the foundation funded in 1998 in Chicago, Illinois cost $105 per SF. However, the Miami library is expected to be 40% larger than the one in Chicago. Assuming a capacity factor of 0.8, what will the new library cost?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
You know the right answer?
A private foundation wants to estimate the construction cost of building a library in Miami, Florida...
Questions