A PLC has a TON Timer block with 16-bit PV variable and maximum time base 1 sec. With this configuration, the maximum time the timer can handle is around 18.2 hours (assuming unsigned PV variable). It is required to turn on an output after 24 hours. One way to achieve the 24 hours is to combine the timer with a counter. Required:
Design a ladder logic program that turns on an output after 24 hours. For each timer you use, specify the time base and preset values. For each counter you use, specify the preset value. You do not have to repeat the output action every 24 hours. In other words, your design does not have to repeat the pattern every 24 hours. Assume any missing information.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine (a) the maximum thermal efficiency of reversible power cycles operating between a hot reservoir at 1000°c and a cold reservoir at 200°c and (b) the maximum cops for reversible refrigeration and heat pump cycies, respectively, between 28°c and 14°c.
Answers: 1
question
Engineering, 06.07.2019 03:10
An electrical kettle is made out of stainless steel,weighs two pounds (when empty) with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling.
Answers: 1
You know the right answer?
A PLC has a TON Timer block with 16-bit PV variable and maximum time base 1 sec. With this configura...
Questions
question
Health, 11.09.2019 21:30
question
English, 11.09.2019 21:30