subject
Engineering, 18.10.2020 15:01 ItzAquaZ1449

This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise office building in a dense urban district. Specifically, the company will be conducting a green demolition in which as many construction and demolition materials will be recovered as possible. This is what I'm trying to figure out--->Describe the process by which the company will prepare for the demolition, including how and in what order the company will incorporate structural and nonstructural deconstruction, a deconstruction survey, hazardous waste disposal, and techniques such as undermining and implosion to successfully complete the green demolition. Be sure to note the purpose of each stage and how Li Construction can ensure it uses environmentally friendly and sustainable practices at each stage in order to meet the project goals.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
You know the right answer?
This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise o...
Questions