subject
Engineering, 16.10.2020 14:01 waterborn7152

Technician A says that primer surface will dry faster if it is sprayed in several coats with flash time between each coat. Technician B says that there will be better adhesion if several coats are applied in just one application, then allowed to dry for several hours. Who's right?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
You know the right answer?
Technician A says that primer surface will dry faster if it is sprayed in several coats with flash t...
Questions
question
History, 25.04.2020 02:08
question
Mathematics, 25.04.2020 02:08
question
Physics, 25.04.2020 02:08