The site earthwork in Phase III of Four Hills Landfill project included a 3.0 ft deep cut across an entire 2.5-acre site. Soil was excavated from within the proposed Phase III footprint. The average unit weight of this soil is 118 lb/ft3, and the average moisture content is 9.6%. It also has a maximum dry unit weight of 122 lb/ft3 and an optimum moisture content of 11.1%, based on the modified Proctor test. The excavated soil will be placed on a nearby site and compacted to an average relative compaction of 93%. Compute the volume of fill that will be produced and express your answer in cubic yards.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
You know the right answer?
The site earthwork in Phase III of Four Hills Landfill project included a 3.0 ft deep cut across an...
Questions