subject
Engineering, 15.10.2020 08:01 tayshhah3945

Molten metal is poured into the downsprue at a constant flow rate during the time it takes to fill the mold. At the end of pouring the sprue is filled and there is negligible metal in the pouring cup. The downsprue is 6.0 in long, its cross sectional area at the top = 0.8 in2, and at the base = 0.6 in2. The cross sectional area of the runner leading from the sprue also = 0.6 in^2, and it is 8.0 in long before leading into the mold cavity, whose volume = 65 in^3. The volume of the riser located along the runner near the mold cavity = 25 in^3. It takes a total of 3.0 sec to fill the entire mold (including cavity, riser, runner, and sprue. This is more than the theoretical time required, indicating a loss of velocity due to friction in the sprue and runner. Determine: a. The theoretical velocity and flow rate at the base of the downsprue assuming no friction and zero velocity in the pouring cup.
b. Total volume of the mold, including downsprue, runner, and riser.
c. Actual velocity and flow rate at the base of the sprue
d. Loss of head in the gating system due to friction.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
You know the right answer?
Molten metal is poured into the downsprue at a constant flow rate during the time it takes to fill t...
Questions
question
Physics, 01.02.2021 21:50
question
Mathematics, 01.02.2021 21:50