subject
Engineering, 25.09.2020 03:01 Sbeech7246

Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine B has a 4 GHz clock. The following measurements are recorded upon execution of a program. Machine A Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 10 4 6
CPI 2 3 1
Machine B Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 14 5 8
CPI 2 8 1
For Machine A, what is the average CPI and execution time?
For Machine B, what is the average CPI and execution time?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
You know the right answer?
Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine...
Questions
question
Chemistry, 24.07.2020 17:01