subject
Engineering, 20.09.2020 14:01 trinityparrish47

When should the word "drill" replace the word "diameter" when dimensioning a hole?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
When should the word "drill" replace the word "diameter" when dimensioning a hole?...
Questions
question
Mathematics, 29.03.2021 23:30
question
Mathematics, 29.03.2021 23:30
question
Mathematics, 29.03.2021 23:30
question
Mathematics, 29.03.2021 23:30
question
English, 29.03.2021 23:30
question
Mathematics, 29.03.2021 23:30