A steel spur gear and mating pinion similar to those you have seen in class have 67 and 24 teeth respectively. The pitch, P, is 12 and the pressure angle is 20°. The face width is 7/8 inch. The gears are to be used in conveyer drive. The gears operate continuously with a pinion speed of 1760 rpm. They must be 99% reliable over a period of 2 years while continuously transmitting 6 hp. In this application we know or assume: • The gears are machined.
• The velocity factor can be determined from Curve D in Figure 15.24 in J&M.
• The power source (electric motor) is uniform.
• The load is uniform.
• The gear mountings are not very rigid or accurate but contact across the full face of the gears will be obtained.
• The gear accuracy is not sufficient to assume that gear loads are shared among teeth.
• The gears operate at room temperature
a) What core hardness of the pinion is required in light of pinion tooth bending fatigue requirements?
b) What core hardness of the gear is required in light of gear tooth bending fatigue requirements?
c) What surface hardness of the pinion is required in light of pinion tooth surface fatigue requirements?
d) What surface hardness of the gear is required in light of gear tooth surface fatigue requirements?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i.e., a violation of one statement leads to the violatio the other statement)
Answers: 2
You know the right answer?
A steel spur gear and mating pinion similar to those you have seen in class have 67 and 24 teeth res...
Questions
question
Mathematics, 16.09.2019 17:30