subject
Engineering, 27.08.2020 20:01 xxkeyxx51

An engineering team has a goal of developing a bicycle frame that is both lighter and stronger than previous models. Which cost-benefit analysis has
left out potential risks?

A. Better function compared to ecological damage of mining
materials and research and development time
B. Increased sales compared to research and development time and
cost of materials
O C. Increased sales compared to employee stress and loss of natural
resources
D. Better function compared to uncertain supply of materials and
research and development time

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
An engineering team has a goal of developing a bicycle frame that is both lighter and stronger than...
Questions
question
Biology, 31.07.2019 04:00
question
Mathematics, 31.07.2019 04:00