subject
Engineering, 21.07.2020 18:01 Will1119

etermine Criteria, Constraints, and Prioritization From your research, determine what criteria need to be met for your problem that all solutions must provide. What are some specifications that scientists, engineers, or local governments are trying to accomplish? Also research some of the constraints that will limit all possible solutions. Then, prioritize the criteria and constraints: What to submit? Mention which part of the project you are working on.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
etermine Criteria, Constraints, and Prioritization From your research, determine what criteria need...
Questions
question
Mathematics, 13.09.2021 21:50
question
Geography, 13.09.2021 21:50