subject
Engineering, 13.07.2020 22:01 JohnJamesPaksitani

An operator decided to develop a subsea drill center of 4 oil wells. The production from the drill center is to be transported to a receiving facility by a single pipeline. What do you recommend the operator to install for production commingling from the 4 wells,

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
question
Engineering, 06.07.2019 03:10
An electrical kettle is made out of stainless steel,weighs two pounds (when empty) with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling.
Answers: 1
question
Engineering, 06.07.2019 04:10
An array of m-50 thermoelectric modules is installed on the exhaust of a sports car. each module has an effective seebeck coefficient of sp of 0.143 5vk and an internal electrical resistance of r.-4 ? in addition, : (15 points each module is of width w 60mm and contains n=100 pairs of semiconducting pellets. each pellet hasan overall length of 2l-5mm and a cross-sectional area as 1.2 x 10'm and is characterized by a thermal conductivity of kpl2w rnk. the hot side of each module is exposed to exhaust gases at·p650c with hia4ow rrk while the osite side of each module is cooled by pressurized water at surface) and 156 °c (at the cool surface). 11s c with h: -500w/m'k. the modules are wired n series and the load resistance is r d=400ohm .the module surface temperatures, t, and ts are 183 "c (at the hot surface and 156c (at the cool surface) a)-draw a schematic of this scenario and label all parts. a. b. if the induced current, i, is 0.15 amps, what is the total power (pa) for one module? c. what is the total power harvest from the exhaust with all 50 modules?
Answers: 2
question
Engineering, 06.07.2019 05:10
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
You know the right answer?
An operator decided to develop a subsea drill center of 4 oil wells. The production from the drill c...
Questions
question
Chemistry, 05.05.2020 02:46
question
Mathematics, 05.05.2020 02:46
question
Mathematics, 05.05.2020 02:46
question
Computers and Technology, 05.05.2020 02:46
question
History, 05.05.2020 02:46