Trade-offs can be necessary at any point in time during the life cycle of a project. It is quite possible, and probable, for the criteria for the trade-offs to change over the life cycle of the project. Please also identifies how the relative importance of constraints of time, cost, and performance can change over the life cycle of the project.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
You know the right answer?
Trade-offs can be necessary at any point in time during the life cycle of a project. It is quite pos...
Questions
question
Mathematics, 08.07.2019 13:30
question
Mathematics, 08.07.2019 13:30
question
Mathematics, 08.07.2019 13:30